Erlang C staffing
Estimate the agents needed to meet a queue service-level target, with occupancy and shrinkage included.
Understand how leave, training and other unavailable time affect your staffing requirement.

Plan leave, breaks, training and unplanned absence consistently. Avoid counting one time category more than once.
Total paid scheduled hours: 160 hours
Estimates from your inputs. No data is submitted.
Shrinkage = unavailable hours / paid hours. Roster requirement = ceil[productive agents / (1 − shrinkage)].
Shrinkage must be less than 100%. Occupancy and shrinkage measure different things; do not subtract the same unavailable time twice.
Shrinkage is the proportion of paid scheduled time unavailable for customer handling. Plan internal and external shrinkage consistently to avoid double counting.
These are the default inputs shown in the calculator and the result it returns for them. Change any input above to model your own operation.
| Input | Value |
|---|---|
| Total paid scheduled hours | 160 hours |
| Unavailable hours | 48 hours |
| Required productive agents | 20 |
| Result | Value |
|---|---|
| Shrinkage | 30% |
| Roster requirement | 29 |
| Additional roster positions | 9 |
Many operations plan around 30%, but the right figure comes from your own paid hours and unavailable time such as leave, training, meetings and breaks.
The roster needed is the productive agents required divided by (1 − shrinkage), rounded up. At 30% shrinkage, 20 productive agents need a roster of 29.
Estimate the agents needed to meet a queue service-level target, with occupancy and shrinkage included.
Turn expected daily workload, productive hours and shrinkage into a simple staffing baseline.
Measure the share of available queue time spent handling customer work.
Bring your inputs and questions. Our team can walk through the DialerBee workflow that fits your requirements.